• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • About
  • Download
  • Publications
  1. Safety
  • Year report
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Poland
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Occurrences

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ - Poland EPWA
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ - Poland Others
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Poland

Download Report

PRB monitoring

▪ PANSA achieved the RP3 EoSM targets in 2020 and exceeded the target maturity for safety culture and safety promotion.

▪ The achieved levels are better than what was planned for 2020 in the draft 2019 performance plan. PANSA continued to implement the improvements initiated in RP2 and documented in the internal SMS development roadmap.

▪ Two other ANSPs included in the Poland’s draft 2019 performance plan (Warmia i Mazury sp. z o.o. and Port Lotniczy Bydgoszcz S.A.) achieved the target on four out of five safety objectives with both needing to improve in the safety risk management objective.

▪ Poland recorded stable performance with respect to safety occurrences with a marginally higher rate of SMIs and a lower rate of RIs in 2020 compared to 2019.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All five EoSM components of PANSA meet, or exceed, already the 2024 target level. Four out of five EoSM components of Port Lotniczy meet already the 2024 target level. Only the component “Safety Risk Management” is below 2024 target level. Improvements in safety risk management are still expected during RP3 to achieve 2024 targets. Same situation is applicable to Warmia i Mazury.

Occurrences - Rate of runway incursions (RIs) (PI#1) & Rate of separation minima infringements (SMIs) (PI#2)

 
  • © European Union, 2024

  • Disclaimer

  • [email protected]

  • Website published by EUROCONTROL for the European Commission