• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • About
  • Download
  • Publications
  1. Safety
  • Year report
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Austria
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Occurrences

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Austria

Download Report

PRB monitoring

▪ Austro Control did not achieve the RP3 targets for the EoSM in any of the safety management objectives in 2020.

▪ Based on the maturity achieved at the end of RP2, the EoSM performance is lower than expected (Austro Control exceeded the targets in all management objectives and was among the best performing ANSPs in 2019). Austro Control needs to improve its maturity by one level on 15 out of 28 EoSM questions to achieve the RP3 targets.

▪ The improvements to achieve the next levels of maturity have been identified and included in Austro Control’s specific improvement plan that will be implemented during 2021.

▪ The overall safety performance of Austro Control is stable and the rate of occurrences are lower than previous years.

▪ Austro Control should improve its safety management system by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All EoSM components are below 2024 EoSM target levels. Improvements in safety management are still expected in all components during RP3 to achieve 2024 targets.

Occurrences - Rate of runway incursions (RIs) (PI#1) & Rate of separation minima infringements (SMIs) (PI#2)

 
  • © European Union, 2024

  • Disclaimer

  • [email protected]

  • Website published by EUROCONTROL for the European Commission