• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • About
  • Download
  • Publications
  1. Safety
  • Year report
    • 2023
    • 2022
    • 2021 ✓
    • 2020

  • Poland
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Occurrences

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ - Poland EPWA
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ - Poland Others
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Poland

Download Report

PRB monitoring

▪ PANSA achieved the RP3 EoSM targets in 2021 and exceeded the target maturity for safety culture and safety promotion. PANSA successfully implemented measures defined in their safety management development roadmap, leading PANSA to achieve the level D for all five management objectives.

▪ Port Lotniczy Bydgoszcz S.A. and Warmia i Mazury sp. z o.o. need to improve in the area of safety risk management but achieved the targets for the four other management objectives. Both ANSPs are in line with the maturity levels according to Poland’s performance plan.

▪ Poland recorded a higher rate of runway incursions and lower rate of separation minima infringements in 2021 relative to 2020. The rate of runway incursions is above the Union-wide average rate.

▪ Poland should improve its safety management by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All five EoSM components of PANSA meet, or exceed, already the 2024 target level. Improvements in maturity has been observed with respect to 2020, reaching the maximum level of maturity possible. Four out of five EoSM components of Port Lotniczy Bydgoszcz meet already the 2024 target level. Only the component “Safety Risk Management” is below 2024 target level. Improvements in safety risk management are still expected during RP3 to achieve 2024 targets. Same situation is applicable to Warmia i Mazury.

Occurrences - Rate of runway incursions (RIs) (PI#1) & Rate of separation minima infringements (SMIs) (PI#2)

 
  • © European Union, 2024

  • Disclaimer

  • [email protected]

  • Website published by EUROCONTROL for the European Commission