  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Investments - Italy
  • Investments - Italy
  • PRB monitoring
  • Value of assets
    • By category
    • En route and terminal
    • By type
    • Compared to Union-wide

  • Costs
    • New and existing investments
    • En route
    • Terminal
    • New major investments

  • Expected benefit and impact

  • Public funding

Investments - Italy

PRB monitoring

▪ ENAV planned a total RP3 asset value for new investments of 344M€₂₀₁₇, of which 70% for new major investments. ENAV planned 15 new major investments for RP3, all of which have started.

▪ ENAV planned RP3 new investments represent 7% of the Union-wide total amounts of the assets for new investments. ENAV planned to invest more in CNS systems compared to the Union-wide median (22% vs 18% respectively), and less for ATM systems (40% vs 47%).

▪ ENAV underspent -11M€₂₀₁₇ (-1.5%) in costs related to investments during RP3 (-9.6M€₂₀₁₇ in en route and -1.2M€₂₀₁₇ in terminal), according to the reporting tables. However, in the monitoring reports, ENAV reported an underspending of -56M€₂₀₁₇ (-11%). No explanation for the differences has been provided. The PRB recommends that the NSA conduct a thorough review of the investments costs and provide all the required information regarding investments in RP4, in the context of the annual monitoring process and the cost-exempt reporting, to enhance transparency for airspace users.

▪ ENAV reported 13M€₂₀₁₇ funding from Union assistance programmes in RP3, while SESAR Deployment Manager data indicates payments for 23M€₂₀₁₇ during the reference period.

Value of the assets for New Investments included in the Performance Plan Italy | ENAV

Determined and additional asset value by investment category

Total value of the asset for new investments (M€2017) 344.19 % of total
New major investments (above 5M€ each) 239.55 70%
Included in the performance plan 239.55 70%
Additional 0.00 0%
Other new investments (below 5M€ each) 104.65 30%

Determined asset value: en route and terminal

Total value of the asset for new major investments (M€2017) 239.55 % of total
En route 176.04 73%
Terminal 63.51 27%

Determined asset value by type of investment

Total value of the asset for new major investments (M€2017) 239.55 % of total
ATM systems 95.03 40%
CNS systems 51.74 22%
Infrastructure 54.71 23%
Other 24.59 10%
Unknown 13.47 6%

Asset value for new investments: ANSP compared to Union-wide

Costs related to investments included in the Performance Plan Italy | ENAV

New and existing investments

Determined costs 2020D 2021D 2022D 2023D 2024D RP3
Total costs of new and existing investments (M€2017) 77.49 79.82 99.97 112.87 123.97 494.12
New major investments 37.58 41.68 47.43 44.46 68.39 239.55
Other new investments 8.47 12.87 21.27 36.05 25.99 104.65
Existing investments 31.45 25.27 31.27 32.36 29.59 149.93
Actual costs 2020A 2021A 2022A 2023A 2024A RP3
Total costs of new and existing investments (M€2017) 77.49 76.07 87.76 94.47 101.96 437.75
New major investments 37.58 42.49 44.71 46.87 52.33 223.99
Other new investments 8.47 10.56 16.52 16.02 14.20 65.76
Existing investments 31.45 23.02 26.53 31.58 35.43 148.00
Difference (A-D) 2020 2021 2022 2023 2024 RP3
Total difference (M€2017) 0.00 (3.76) (12.21) (18.40) (22.01) (56.37)
New major investments 0.00 0.82 (2.72) 2.40 (16.06) (15.56)
% change of actual with respect to determined 0% +2% -6% +5% -23% -22%
Other new investments 0.00 (2.32) (4.75) (20.02) (11.79) (38.88)
% change of actual with respect to determined 0% -18% -22% -56% -45% -141%
Existing investments 0.00 (2.26) (4.74) (0.77) 5.84 (1.93)
% change of actual with respect to determined 0% -9% -15% -2% +20% -7%


Costs of investments by nature - En route

Determined costs 2020D 2021D 2022D 2023D 2024D RP3
Total costs of new and existing investments (M€2017) 134.07 117.84 114.25 115.94 117.63 599.72
Depreciation 91.26 84.94 88.77 88.98 89.12 443.06
Cost of capital 42.81 32.90 25.48 26.96 28.51 156.67
Cost of leasing 0.00 0.00 0.00 0.00 0.00 0.00
Actual costs 2020A 2021A 2022A 2023A 2024A RP3
Total costs of new and existing investments (M€2017) 134.07 113.77 109.39 117.07 115.85 590.14
Depreciation 91.26 82.38 80.16 79.53 81.25 414.58
Cost of capital 42.81 31.39 29.23 37.54 34.60 175.56
Cost of leasing 0.00 0.00 0.00 0.00 0.00 0.00
Difference (A-D) 2020 2021 2022 2023 2024 RP3
Total difference (M€2017) 0.00 (4.07) (4.86) 1.13 (1.78) ( 9.59)
Depreciation 0.00 (2.56) (8.61) ( 9.45) (7.86) (28.48)
Cost of capital 0.00 (1.52) 3.74 10.58 6.09 18.89
Cost of leasing 0.00 0.00 0.00 0.00 0.00 0.00


Costs of investments by nature - Terminal

Determined costs 2020D 2021D 2022D 2023D 2024D RP3
Total costs of new and existing investments (M€2017) 27.50 22.99 23.19 23.81 24.35 121.84
Depreciation 17.82 16.59 17.34 17.38 17.40 86.52
Cost of capital 9.68 6.40 5.86 6.44 6.95 35.32
Cost of leasing 0.00 0.00 0.00 0.00 0.00 0.00
Actual costs 2020A 2021A 2022A 2023A 2024A RP3
Total costs of new and existing investments (M€2017) 27.50 21.99 22.38 24.50 24.30 120.67
Depreciation 17.82 16.09 15.66 15.53 15.87 80.98
Cost of capital 9.68 5.90 6.72 8.96 8.43 39.68
Cost of leasing 0.00 0.00 0.00 0.00 0.00 0.00
Difference (A-D) 2020 2021 2022 2023 2024 RP3
Total difference (M€2017) 0.00 (1.00) (0.82) 0.69 (0.05) (1.17)
Depreciation 0.00 (0.49) (1.68) (1.84) (1.53) (5.54)
Cost of capital 0.00 (0.50) 0.86 2.53 1.48 4.37
Cost of leasing 0.00 0.00 0.00 0.00 0.00 0.00


Costs by new major investments

Determined costs 2020D 2021D 2022D 2023D 2024D RP3
Total costs of new and existing investments (M€2017) 37.58 41.68 47.43 44.46 68.39 239.55
AMPLIAMENTI E RISTR. ACC 0.18 1.89 6.13 2.38 4.20 14.79
NUOVO SISTEMA ATM ACC 10.86 5.11 2.32 5.02 6.59 29.91
NUOVE TWR/BT 1.48 1.65 3.86 4.42 6.60 18.01
AUTOMAZIONE OPERATIVA ACC 4.70 9.96 10.24 8.04 7.77 40.71
RADAR 0.45 0.04 3.37 3.96 7.89 15.70
TORRI REMOTE 2.54 1.91 1.57 2.89 5.46 14.38
CENTRI RADIO TBT DEGLI ACC 1.17 2.71 2.35 3.41 4.34 13.97
MANUTENZIONE EVOLUTIVA 5.63 5.63 5.63 2.56 4.96 24.41
AMPLIAMENTI E RISTR. EDIFICI 0.07 0.06 1.61 2.72 3.08 7.53
RADIOASSISTENZE Rotta/APT 1.77 1.38 1.22 1.10 3.15 8.63
RETE E-NET 1.80 1.71 1.58 1.13 2.19 8.41
INTERVENTI NON PROGR. CNS/ATM 1.73 3.31 1.57 2.18 4.68 13.47
RADAR DI SUPERFICIE 0.02 1.10 1.32 0.72 1.86 5.03
SISTEMI METEO CENTRALI 1.41 2.08 0.99 1.54 1.55 7.56
SISTEMI INFORMATIVI 3.76 3.12 3.68 2.39 4.08 17.03
Actual costs 2020A 2021A 2022A 2023A 2024A RP3
Total costs of new and existing investments (M€2017) 37.58 42.49 44.71 46.87 52.33 223.99
AMPLIAMENTI E RISTR. ACC 0.18 0.90 1.49 1.73 0.42 4.72
NUOVO SISTEMA ATM ACC 10.86 8.02 5.56 3.10 4.14 31.69
NUOVE TWR/BT 1.48 1.27 2.54 2.12 2.00 9.41
AUTOMAZIONE OPERATIVA ACC 4.70 8.96 5.40 7.17 8.61 34.84
RADAR 0.45 0.51 3.77 8.03 7.07 19.82
TORRI REMOTE 2.54 2.25 1.52 6.17 9.37 21.85
CENTRI RADIO TBT DEGLI ACC 1.17 2.74 2.79 0.99 4.44 12.13
MANUTENZIONE EVOLUTIVA 5.63 5.63 5.63 1.96 0.35 19.20
AMPLIAMENTI E RISTR. EDIFICI 0.07 0.44 0.35 0.41 1.40 2.67
RADIOASSISTENZE Rotta/APT 1.77 1.41 1.71 1.42 1.28 7.59
RETE E-NET 1.80 0.86 1.65 2.13 1.98 8.43
INTERVENTI NON PROGR. CNS/ATM 1.73 2.74 1.36 2.31 1.66 9.78
RADAR DI SUPERFICIE 0.02 0.79 2.58 0.55 0.09 4.03
SISTEMI METEO CENTRALI 1.41 1.65 2.21 2.14 4.98 12.39
SISTEMI INFORMATIVI 3.76 4.33 6.16 6.65 4.55 25.46
Difference (A-D) 2020 2021 2022 2023 2024 RP3
Total difference (M€2017) 0.00 0.82 (2.72) 2.40 (16.06) (15.56)
AMPLIAMENTI E RISTR. ACC 0.00 (0.99) (4.65) (0.65) (3.78) (10.07)
NUOVO SISTEMA ATM ACC 0.00 2.91 3.24 (1.92) (2.45) 1.78
NUOVE TWR/BT 0.00 (0.38) (1.32) (2.30) (4.60) (8.60)
AUTOMAZIONE OPERATIVA ACC 0.00 (1.00) (4.84) (0.88) 0.83 (5.88)
RADAR 0.00 0.47 0.40 4.07 (0.82) 4.12
TORRI REMOTE 0.00 0.34 (0.05) 3.27 3.90 7.47
CENTRI RADIO TBT DEGLI ACC 0.00 0.04 0.44 (2.42) 0.10 (1.84)
MANUTENZIONE EVOLUTIVA 0.00 0.00 0.00 (0.60) (4.61) (5.21)
AMPLIAMENTI E RISTR. EDIFICI 0.00 0.37 (1.26) (2.31) (1.67) (4.87)
RADIOASSISTENZE Rotta/APT 0.00 0.02 0.49 0.32 (1.87) (1.03)
RETE E-NET 0.00 (0.85) 0.08 1.00 (0.21) 0.02
INTERVENTI NON PROGR. CNS/ATM 0.00 (0.57) (0.22) 0.12 (3.02) (3.69)
RADAR DI SUPERFICIE (0.00) (0.32) 1.25 (0.17) (1.77) (1.00)
SISTEMI METEO CENTRALI 0.00 (0.43) 1.23 0.60 3.43 4.83
SISTEMI INFORMATIVI 0.00 1.21 2.48 4.26 0.48 8.43


Expected benefit and impact per new major investment Italy | ENAV

New major investments Expected benefit per KPA SAF ENV CAP CEF
RADAR
TORRI REMOTE
NUOVE TWR/BT
AUTOMAZIONE OPERATIVA ACC
RETE E-NET X
NUOVO SISTEMA ATM ACC X X
SISTEMI INFORMATIVI X
RADIOASSISTENZE Rotta/APT X
AMPLIAMENTI E RISTR. ACC
CENTRI RADIO TBT DEGLI ACC
MANUTENZIONE EVOLUTIVA X
RADAR DI SUPERFICIE X X
AMPLIAMENTI E RISTR. EDIFICI
INTERVENTI NON PROGR. CNS/ATM
SISTEMI METEO CENTRALI
New major investments Expected impact Network Local Non-performance
RADAR X
TORRI REMOTE X
NUOVE TWR/BT
AUTOMAZIONE OPERATIVA ACC
RETE E-NET
NUOVO SISTEMA ATM ACC
SISTEMI INFORMATIVI X
RADIOASSISTENZE Rotta/APT X
AMPLIAMENTI E RISTR. ACC
CENTRI RADIO TBT DEGLI ACC
MANUTENZIONE EVOLUTIVA
RADAR DI SUPERFICIE
AMPLIAMENTI E RISTR. EDIFICI X X
INTERVENTI NON PROGR. CNS/ATM X
SISTEMI METEO CENTRALI


New major investments SES mandated Partnership
ATM systems
ATM system CP/MP
RADAR X X
TORRI REMOTE X X
NUOVE TWR/BT X X X
AUTOMAZIONE OPERATIVA ACC X X X
RETE E-NET X X X
NUOVO SISTEMA ATM ACC X X X
SISTEMI INFORMATIVI
RADIOASSISTENZE Rotta/APT X X
AMPLIAMENTI E RISTR. ACC X X
CENTRI RADIO TBT DEGLI ACC X X X
MANUTENZIONE EVOLUTIVA X X X
RADAR DI SUPERFICIE X X X
AMPLIAMENTI E RISTR. EDIFICI X
INTERVENTI NON PROGR. CNS/ATM X X
SISTEMI METEO CENTRALI X X X


Public funding granted for total CAPEX (CEF/TEN-T)

Actual funding declaration vs payments

Funding declared (M€2017) 2020 2021 2022 2023 2024 RP3
Total included in the funding declaration (reporting tables) 0.00 4.48 2.31 3.32 2.54 12.64
SDM Payment 0.98 3.80 10.31 4.51 3.73 23.33
Difference between total funding declared vs received (0.98) 0.67 (8.00) (1.19) (1.20) (10.69)


 