• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Safety
  • Year report
    • RP3
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Lithuania
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Runway incursions
      • Separation minima infringements
      • Occurrences reporting
    • ASDRS

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Lithuania

PRB monitoring

▪ SE Oro Navigacjia achieved the RP3 EoSM targets in 2020 and exceeded the target in the safety policy and objectives and safety promotion objectives. The achieved levels are better than what was planned in the 2019 draft performance plan.

▪ Compared with the maturity level reached in RP2, SE Oro Navigacjia has continued to improve the maturity of its safety management during the first year of RP3 and achieved the RP3 targets before planned.

▪ In terms of safety occurrences, Lithuania reported a lower rate of SMIs and a higher rate of RIs in 2020 compared to 2019. According to Lithuania’s adopted acceptable and tolerated levels of safety, the 2020 rates of occurrences are at an acceptable level of safety.

▪ SE Oro Navigacjia should improve its SMS by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All five EoSM components of the ANSP meet, or exceed, already the 2024 target level.

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Safety occurrences

Rate of runway incursions (RIs) (PI#1)

Rate of RIs per 100,000 airport movements - Lithuania
# Airport name APT movements Number of RI Rate RI per 100,000
1 Vilnius) NA NA NA
Focus on runway incursions

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Rate of separation minima infringements (SMIs) (PI#2)

Rate of SMI with ANS contribution per 100,000 flight hours
# ANSP
Flight hours
Number of SMIs
Rate of SMI per 100,000 flight hours
% variation in rate of SMIs
2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024
1 ORO NAVIGACIJA 36,493 NA NA NA NA 1 NA NA NA NA 2.7 NA NA NA NA NA NA NA NA NA
Focus on separation minima

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Quality of occurences reporting

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Use of automated safety data recording system (ASDRS) (PI#3)

Use of automated safety data recording system - 2020
For RIs For SMIs
  ✘   ✘

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

 
  • © European Union, 2025

  • Disclaimer

  • Website published by EUROCONTROL for the European Commission