• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • About
  • Download
  • Publications
  1. Safety
  • Year report
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Lithuania
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Occurrences

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Lithuania

Download Report

PRB monitoring

▪ SE Oro Navigacjia achieved the RP3 EoSM targets in 2020 and exceeded the target in the safety policy and objectives and safety promotion objectives. The achieved levels are better than what was planned in the 2019 draft performance plan.

▪ Compared with the maturity level reached in RP2, SE Oro Navigacjia has continued to improve the maturity of its safety management during the first year of RP3 and achieved the RP3 targets before planned.

▪ In terms of safety occurrences, Lithuania reported a lower rate of SMIs and a higher rate of RIs in 2020 compared to 2019. According to Lithuania’s adopted acceptable and tolerated levels of safety, the 2020 rates of occurrences are at an acceptable level of safety.

▪ SE Oro Navigacjia should improve its SMS by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All five EoSM components of the ANSP meet, or exceed, already the 2024 target level.

Occurrences - Rate of runway incursions (RIs) (PI#1) & Rate of separation minima infringements (SMIs) (PI#2)

 
  • © European Union, 2024

  • Disclaimer

  • [email protected]

  • Website published by EUROCONTROL for the European Commission