• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • About
  • Download
  • Publications
  1. Safety
  • Year report
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Slovenia
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Occurrences

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Slovenia

Download Report

PRB monitoring

▪ Slovenia Control achieved the RP3 EoSM targets in four out of five management objectives and only needs to further improve in the safety risk management objective.

▪ The achieved maturity levels are consistent with the planned levels included in the draft 2019 performance plan. Slovenia Control, together with the NSA, implemented multiple review processes and continuous monitoring to ensure a continued high safety performance.

▪ Slovenia had a good performance with respect to safety occurrences with no occurrences recorded neither for SMIs nor RIs.

▪ Slovenia Control should improve its SMS by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

Four out of five EoSM components of the ANSP meet already the 2024 target level. Only the component “Safety Risk Management” is below 2024 target level, at level C. Improvements in safety risk management are still expected during RP3 to achieve 2024 targets.

Occurrences - Rate of runway incursions (RIs) (PI#1) & Rate of separation minima infringements (SMIs) (PI#2)

 
  • © European Union, 2024

  • Disclaimer

  • [email protected]

  • Website published by EUROCONTROL for the European Commission