| Total value of the asset for new investments (M€2017) | 129.84 | % of total |
|---|---|---|
| New major investments (above 5M€ each) | 100.25 | 77% |
| Included in the performance plan | 100.25 | 77% |
| Additional | 0.00 | 0% |
| Other new investments (below 5M€ each) | 29.59 | 23% |
Investments - Austria
PRB monitoring
▪ Austro Control planned a total RP3 asset value for new investments of 130M€₂₀₁₇, of which 77% for new major investments. Austro Control planned nine new major investments for RP3.
▪ Austro Control planned RP3 new investments represent 3% of the Union-wide total amounts of the assets for new investments. Austro Control planned to invest more in CNS systems compared to the Union-wide median (45% vs 18% respectively), and less for ATM systems (29% vs 47%).
▪ Austro Control underspent -19M€₂₀₁₇ (-12%) in costs related to investments during RP3 (-16M€₂₀₁₇ in en route and -3.5M€₂₀₁₇ in terminal), according to the reporting tables. These amounts shall be reimbursed to the airspace users through a reduction of future unit rate(s), unless the NSA decides after consultation with the users, that the ANSP shall not reimburse a part of the difference according to article 28 of Regulation (EU) 2019/317.
▪ Through RP3, Austria has not provided an annual breakdown of the average net book value, depreciation, or leasing costs for any investment of Austro Control. There is therefore a lack of adequate and detailed information on investments to ensure transparency and compliance with reporting requirements.
▪ Austria should provide all the required information regarding investments in RP4, in the context of the annual monitoring process and the cost-exempt reporting, to enhance transparency for airspace users.
▪ Austria did not report funding from Union assistance programmes in RP3, while SESAR Deployment Manager data indicates payments for 11M€ during the reference period. Austria should review the facts and ensure that all appropriate reimbursements as other revenues are made as soon as practicable.
Value of the assets for New Investments included in the Performance Plan Austria | Austro Control
Determined and additional asset value by investment category
Determined asset value: en route and terminal
| Total value of the asset for new major investments (M€2017) | 100.25 | % of total |
|---|---|---|
| En route | 74.54 | 74% |
| Terminal | 25.71 | 26% |
Determined asset value by type of investment
| Total value of the asset for new major investments (M€2017) | 100.25 | % of total |
|---|---|---|
| ATM systems | 28.82 | 29% |
| CNS systems | 45.28 | 45% |
| Infrastructure | 15.36 | 15% |
| Other | 10.79 | 11% |
| Unknown | 0.00 | 0% |
Asset value for new investments: ANSP compared to Union-wide
Expected benefit and impact per new major investment Austria | Austro Control
| New major investments | Expected benefit per KPA | SAF | ENV | CAP | CEF |
|---|---|---|---|---|---|
| Voice Communication | |||||
| NAV Infrastructure | |||||
| Carrier Infrastructure | X | X | X | ||
| Airport Throughput | X | X | |||
| COOPANS (AT) | X | ||||
| ATS-Enabler | |||||
| ANS Enabler | X | X | X | X | |
| AIM Infrastructure | |||||
| MET Infrastructure | X |
| New major investments | Expected impact | Network | Local | Non-performance |
|---|---|---|---|---|
| Voice Communication | ||||
| NAV Infrastructure | ||||
| Carrier Infrastructure | X | X | ||
| Airport Throughput | ||||
| COOPANS (AT) | ||||
| ATS-Enabler | ||||
| ANS Enabler | X | X | X | |
| AIM Infrastructure | ||||
| MET Infrastructure |
| New major investments | SES mandated | Partnership |
ATM systems
|
|
|---|---|---|---|---|
| ATM system | CP/MP | |||
| Voice Communication | X | X | X | |
| NAV Infrastructure | X | X | ||
| Carrier Infrastructure | X | X | ||
| Airport Throughput | X | X | X | |
| COOPANS (AT) | X | X | X | X |
| ATS-Enabler | X | X | X | |
| ANS Enabler | X | |||
| AIM Infrastructure | X | X | X | |
| MET Infrastructure | X | X | X | |
Public funding granted for total CAPEX (CEF/TEN-T)
Actual funding declaration vs payments
| Funding declared (M€2017) | 2020 | 2021 | 2022 | 2023 | 2024 | RP3 |
|---|---|---|---|---|---|---|
| Total included in the funding declaration (reporting tables) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| SDM Payment | 0.14 | 6.41 | 1.14 | 1.91 | 1.57 | 11.16 |
| Difference between total funding declared vs received | (0.14) | (6.41) | (1.14) | (1.91) | (1.57) | (11.16) |