• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Safety
  • Year report
    • RP3
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Latvia
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Runway incursions
      • Separation minima infringements
      • Occurrences reporting
    • ASDRS

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Latvia

PRB monitoring

▪ LGS achieved its RP3 EoSM targets in four out of five management objectives. Improvements are still needed in the safety risk management objective, but the achieved levels are consistent with what was planned in the draft 2019 performance plan.

▪ The main measures the NSA plan to improve performance rely on further implementation of the Commission Implementing Regulation (EU) 2017/373.

▪ The PRB notes that compared with the maturity level reach during RP2, LGS continued to improve the maturity of its safety management during the first year of RP3. For the safety risk management objective, LGS needs to improve in two EoSM questions to achieve the target, which should be feasible through an increased compliance with the regulation.

▪ Latvia recorded stable performance with respect to safety occurrences with marginally higher rates of SMIs in 2020 with respect to 2019 and no occurrences of RIs in 2020.

▪ LGS should improve its SMS by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

Four out of five EoSM components of the ANSP meet already the 2024 target level. Only the component “Safety Risk Management” is below 2024 target level. Improvements in safety risk management are still expected during RP3 to achieve 2024 targets.

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Safety occurrences

Rate of runway incursions (RIs) (PI#1)

Rate of RIs per 100,000 airport movements - Latvia
# Airport name APT movements Number of RI Rate RI per 100,000
1 Riga 35,410 0 0.00
2 Liepaja 2,222 0 0.00
3 Tukums Jurmala 208 0 0.00
4 Ventspils 107 0 0.00
Focus on runway incursions

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Rate of separation minima infringements (SMIs) (PI#2)

Rate of SMI with ANS contribution per 100,000 flight hours
# ANSP
Flight hours
Number of SMIs
Rate of SMI per 100,000 flight hours
% variation in rate of SMIs
2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024
1 LGS 39,170 NA NA NA NA 1 NA NA NA NA 2.6 NA NA NA NA NA NA NA NA NA
Focus on separation minima

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Quality of occurences reporting

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Use of automated safety data recording system (ASDRS) (PI#3)

Use of automated safety data recording system - 2020
For RIs For SMIs
  ✘   ✘

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

 
  • © European Union, 2025

  • Disclaimer

  • Website published by EUROCONTROL for the European Commission