• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Safety
  • Year report
    • RP3
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020 ✓

  • Portugal
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Runway incursions
      • Separation minima infringements
      • Occurrences reporting
    • ASDRS

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Portugal

PRB monitoring

▪ NAV Portugal achieved the RP3 EoSM targets in 2020 and exceeded the targets in two out of five management objectives. The achieved levels are better than what was planned in the draft 2019 performance plan.

▪ The NSA said that NAV Portugal will continue to make every effort to maintain and improve the current safety performance levels and defined a set of measures to achieve this.

▪ Portugal recorded good performance with respect to safety occurrences with no occurrences recorded for SMIs or RIs. This improved the already low rate of SMIs and RIs recorded in 2019.

▪ NAV Portugal should improve its SMS by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All five EoSM components of the ANSP meet, or exceed, already the 2024 target level.

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Safety occurrences

Rate of runway incursions (RIs) (PI#1)

Rate of RIs per 100,000 airport movements - Portugal
# Airport name APT movements Number of RI Rate RI per 100,000
1 Lisbon 90,083 0 0.00
2 Cascais 50,481 0 0.00
3 Porto 43,863 0 0.00
4 Faro 24,927 0 0.00
5 Ponta Delgada 12,626 0 0.00
6 Madeira 11,825 0 0.00
7 Montijo 11,189 NA NA
8 Horta 3,424 0 0.00
9 Santa Maria 2,190 0 0.00
10 Porto Santo 2,101 0 0.00
11 Flores 1,261 0 0.00
Focus on runway incursions

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Rate of separation minima infringements (SMIs) (PI#2)

Rate of SMI with ANS contribution per 100,000 flight hours
# ANSP
Flight hours
Number of SMIs
Rate of SMI per 100,000 flight hours
% variation in rate of SMIs
2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024
1 NAV Portugal 175,009 NA NA NA NA 10 NA NA NA NA 5.7 NA NA NA NA NA NA NA NA NA
Focus on separation minima

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Quality of occurences reporting

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

Use of automated safety data recording system (ASDRS) (PI#3)

Use of automated safety data recording system - 2020
For RIs For SMIs
  ✘   ✘

Detailed information on Safety performance monitoring for the year 2020 are included in Performance Review Body Monitoring Report 2020, Annex III – Safety report

 
  • © European Union, 2025

  • Disclaimer

  • Website published by EUROCONTROL for the European Commission