• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • About
  • Download
  • Publications
  1. Safety
  • Year report
    • 2023
    • 2022 ✓
    • 2021
    • 2020

  • Austria
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Occurrences

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Austria

Download Report

PRB monitoring

▪ Austria (Austro Control) did not achieve the RP3 targets in any of the safety management objectives in 2022 and requires improvement in ten areas out of 28 by the end of RP3. This is in line with their performance plan.

▪ Austro Control developed an improvement plan including specific measures required to reach the expected maturity levels. These measures have been incorporated into the strategic planning of the organisation.

▪ The overall safety performance of the organisation remained stable, the rate of occurrences was comparable with previous years and remained below the Union-wide average.

▪ Austro Control could improve its safety management by implementing automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All EoSM components are below 2024 EoSM target levels. Improvements in safety management are still expected in all components to achieve RP3 targets.

Occurrences - Rate of runway incursions (RIs) (PI#1) & Rate of separation minima infringements (SMIs) (PI#2)

 
  • © European Union, 2024

  • Disclaimer

  • [email protected]

  • Website published by EUROCONTROL for the European Commission