• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Safety
  • Year report
    • RP3
    • 2024
    • 2023 ✓
    • 2022
    • 2021
    • 2020

  • Italy
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Runway incursions
      • Separation minima infringements
      • Occurrences reporting
    • ASDRS

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ - Italy Zone 1
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ - Italy Zone 2
      • Unit cost
      • AUCU
      • Regulatory Result

Safety - Italy

PRB monitoring

▪ ENAV maintained its safety performance, remaining at the RP3 EoSM target levels in all management objectives in 2023. The achieved maturity levels exceeded the planned maturity levels.

▪ Italy recorded a stable number of safety occurrences, with a similar rate of runway incursions and a marginal decrease in the rate of separation minima infringements.

▪ ENAV do not use automated safety data recording systems.

Effectiveness of Safety Management (EoSM) (KPI#1)

Focus on EoSM

All five EoSM components of the ANSP meet, or exceed, the RP3 target level. The level was maintained compared with 2022.

Detailed information on Safety performance monitoring for the year 2023 are included in Performance Review Body Monitoring Report 2023, Annex I – Safety report

Safety occurrences

Rate of runway incursions (RIs) (PI#1)

Rate of RIs per 100,000 airport movements - Italy
# Airport name APT movements Number of RI Rate RI per 100,000
1 Rome - Fiumicino 266,510 0 0.00
2 Milan - Malpensa 202,087 0 0.00
3 Milan - Linate 110,342 0 0.00
4 Bergamo 101,797 2 1.96
5 Venice 86,624 1 1.15
Focus on runway incursions

Detailed information on Safety performance monitoring for the year 2023 are included in Performance Review Body Monitoring Report 2023, Annex I – Safety report

Rate of separation minima infringements (SMIs) (PI#2)

Rate of SMI with ANS contribution per 100,000 flight hours
# ANSP
Flight hours
Number of SMIs
Rate of SMI per 100,000 flight hours
% variation in rate of SMIs
2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024 2020 2021 2022 2023 2024
1 ENAV 494,359 747,998 1,141,849 1,242,479 NA 26 33 81 78 NA 5.3 6.3 7.1 6.3 NA NA +19% +13% -12% NA
Focus on separation minima

Detailed information on Safety performance monitoring for the year 2023 are included in Performance Review Body Monitoring Report 2023, Annex I – Safety report

Quality of occurences reporting

Detailed information on Safety performance monitoring for the year 2023 are included in Performance Review Body Monitoring Report 2023, Annex I – Safety report

Use of automated safety data recording system (ASDRS) (PI#3)

Use of automated safety data recording system - 2023
For RIs For SMIs
  ✘   ✘

Detailed information on Safety performance monitoring for the year 2023 are included in Performance Review Body Monitoring Report 2023, Annex I – Safety report

 
  • © European Union, 2025

  • Disclaimer

  • Website published by EUROCONTROL for the European Commission