Update on Military dimension of the plan
Impact on environmental KPA is significant due to increased MIL activities in the Baltics region (to negative side). Airspace design Stage I is completed in Q2 2025, new modular TSA were established and are in use. Stage II of new MIL areas are under consideration to support current and future MIL activities. FUA principles are applied for day-to-day airspace managemet, procedures are implemented based on LoA with ASM tool LARA in use between CIV-MIL.
Military - related measures implemented or planned to improve capacity
15 new modular TSAs were created, tested and are in operation. Dynamic mode of TSA activation is introduced to support unplanned MIL activities at tactical level (tactical activation for MIL not affecting CIVIL/GAT, is defined in LoA). New modular TSAs with more dynamic/flexible ways of management solved part of airspace capacity issues, balanced military and civil airspace needs at least for MIL exercises/daily training. INTEL/SURVEILANCE flights most propably will remain, ANSP has no authority to regulating this part of MIL operations.
Initiatives implemented or planned to improve PI#6
ON implemented the latest version of LARA (v4.0) to enhance related performance. An upgrade to LARA version 5.1 is planned for 2025. This aspect will be monitored through periodic audits conducted by the National Supervisory Authority (NSA).
Initiatives implemented or planned to improve PI#7
ON implemented the latest version of LARA (v4.0) to enhance related performance. An upgrade to LARA version 5.1 is planned for 2025. This aspect will be monitored through periodic audits conducted by the National Supervisory Authority (NSA).
Initiatives implemented or planned to improve PI#8
ON implemented the latest version of LARA (v4.0) to enhance related performance. An upgrade to LARA version 5.1 is planned for 2025. This aspect will be monitored through periodic audits conducted by the National Supervisory Authority (NSA).