• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Capacity
  • Year report
    • RP3
    • 2024 ✓
    • 2023
    • 2022
    • 2021
    • 2020

  • Croatia
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Runway incursions
      • Separation minima infringements
      • Occurrences reporting
    • ASDRS

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Capacity - Croatia

Download Report

PRB monitoring

▪ Croatia registered 1.59 minutes of average en route ATFM delay per flight during 2024, which has been adjusted to 1.51 during the post-ops adjustment process, thus not achieving the local target value of 0.17. Delays in Croatia increased by 1.08 minutes per flight year-on-year.

▪ The majority of delays were generated between June and August, mainly driven by adverse weather conditions and the lack of ATC Capacity.

▪ The share of delayed flights with delays longer than 15 minutes in Croatia increased by 12 percentage points compared to 2023 and was higher than 2019 values.

▪ The average number of IFR movements was 30% above 2019 levels in Croatia in 2024.

▪ The number of ATCOs in OPS is 104, being below the 2024 plan in Zagreb by 17 FTEs.

▪ The yearly total of sector opening hours in Zagreb ACC was 38,148, showing a 0.8% increase compared to 2023. Sector opening hours are 4.3% above 2019 levels.

▪ Zagreb ACC registered 23.05 IFR movements per one sector opening hour in 2024, being 26.6% above 2019 levels.

▪ Capacity provision improved slightly in 2024. However, a capacity gap still exists. Croatia should expedite the recruitment and training of controllers and work closely with the Network Manager to mitigate the impact of adverse weather. Actual 2025 figures up to August show an improvement compared to 2024.

En route performance

En route ATFM delay (KPI#1)

Focus on en route ATFM delay

Summary of capacity performance

Croatia experienced an increase in traffic, from 814k flights in 2023, to 922k flights in 2024. In 2024, Croatia had 1 390k minutes of delay, significantly higher than in 2023 (347k minutes of delay). There were an additional 70k minutes of delay originating in Croatia that were re-attributed to DFS via the NM post operations delay attribution process, according to the NMB agreement for eNM/S24 measures, to ameliorate capacity shortfalls in Karlsruhe UAC.

NSA’s assessment of capacity performance

In the year 2024 there were significant challenges for LDZO ACC capacity KPI as the actual traffic was around 33% higher than planned in the RP3 Performance plan while summer season traffic was 10% above historical highest year (2023). As a consequence, limitations occurred during summer season due to unplanned high increase of traffic demand in peak hours. The capacity performance target was not achieved due to a combination of interrelated factors:

Traffic Forecast Deviation: The initial traffic forecast for 2024 projected approximately 696,000 flights; however, actual traffic through Croatian airspace reached 919,500 flights. This figure exceeded even the revised forecast made in February 2024, significantly increasing demand on air traffic management resources.

Low Flight Plan Adherence: Flight plan adherence by airspace users remained below 40% in Croatian airspace. This low level of predictability severely constrained effective capacity planning and hindered the ANSP’s ability to manage resources and sector configurations efficiently.

National Social Policy Impact: The introduction of new demographic measures at the state level granted new parents two months of leave to spend with their families. The uptake of this leave was particularly high during peak traffic months, leading to reduced staffing availability at critical times.

These combined circumstances contributed to the shortfall in meeting the established capacity target, despite mitigation efforts undertaken by the ANSP.

Monitoring process for capacity performance

The Single European Sky Data Portal is the primary information source and is used to monitor all available KPIs and PIs.

The LDZO ACC capacity KPI faced major difficulties in 2024 since summer traffic was significantly higher than in previous years and actual traffic exceeded the RP3 Performance plan’s projections by far.

As a result, during the summer, there were restrictions due to an unforeseen surge in traffic demand during peak hours.

Capacity planning

Capacity planning is done using the Network Cooperative Decision-Making processes through the specialized organizations CAPLAN, NETOPS, and NDOP. Capacity planning is carried out in accordance with NM’s initiative to create a rolling NOP document that describes short-term capacity and demand at the network level.

Capacity is adjusted to traffic demand and reported to NM, which evaluates the efficiency for the planned period. The expected traffic outlook is provided for the next eight weeks and is updated every week.During the local planning process, a number of departments contribute to the strategic and tactical development of the plan.

Application of Corrective Measures for Capacity (if applicable)

Recommendations to the ANSP to rectify the situation:

Enhance Traffic Forecasting and Scenario Planning
Strengthen collaboration with the Network Manager and neighbouring ANSPs to improve short- and medium-term traffic forecasting and develop alternative planning for high-traffic scenarios, taking into account possible forecast deviations.

Engage with Airspace Users on Flight Plan Adherence
Initiate targeted dialogues with airspace users, supported by data, to encourage improved flight plan adherence and raise awareness of its operational impact. Consider coordinating with the Network Manager to escalate this issue at network level.

Measures that have been put in place include:
- Network Weather Mitigation Measures - implementation of new scenarios enabling improved weather and sector management;
- Conitnued effort to increase staffing levels and/or availability - Training Organisation is working at full capacity ensuring maximum student inflow;
- Continued alignment of traffic demand and sector opening times - Implementation of improved sector rostering and sector configuration options;
- Re-evluation of ATC sector capacities - Definition and implementation of improved sector capacities/ monitoring values based on the operational and technological developments;
- Central/South East Europe airspace restructuring - Improved sector volumes (i.e. sector boundaries) and merge of FRAs.

En route Capacity Incentive Scheme

Croatia Control: The NSA reports that, Croatia Control is liable for a financial penalty of €997 452.69
In accordance with Article 3(3)(a) of Implementing Regulation (EU) 2020/1627: The incentive scheme shall cover only the calendar years 2022 to 2024.

Other indicators

Focus on ATCOs in operations

During 2024 there was an increase in the ATCO in OPS FTE compared to 2023 as 9 new ATCO students gain licences and started working in OPS. At the same time the number of ATCOs in OPS who have stopped working in the OPS room is slightly higher than planned due to unforseen retirements.

 