Cost-efficiency - MUAC
PRB monitoring
▪ MUAC actual costs amounted to 194M€2017, -8.2% lower than the determined costs (212M€2017) in 2023.
▪ MUAC actual costs were allocated across the four Member States in the following way in 2023: Germany (91M€2017, 47%), Belgium (65M€2017, 33%), the Netherlands (37M€2017, 19%), and Luxembourg (2M€2017, 1.0%).
Total costs
Actual and determined data | ||||
Total costs - nominal (M€) | 2020-2021 | 2022 | 2023 | 2024 |
---|---|---|---|---|
Actual costs | 378 | 218 | 237 | NA |
Determined costs | 378 | 236 | 240 | 240 |
Difference costs | 0 | −18 | −2 | NA |