• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP3

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Cost-efficiency
  • Year report
    • RP3
    • 2024
    • 2023
    • 2022
    • 2021 ✓
    • 2020

  • Portugal
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Runway incursions
      • Separation minima infringements
      • Occurrences reporting
    • ASDRS

  • Environment
    • PRB monitoring
    • En route performance
      • Horizontal flight efficiency
    • Terminal performance
      • AXOT & ASMA
      • CDO
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • Other indicators
    • Terminal performance
      • Arrival ATFM delay
      • Other performance indicators

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result
    • Terminal CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Cost-efficiency - Portugal

Download Report

PRB monitoring

▪ The en route 2020/2021 actual unit cost of Portugal was 64.95 €2017, -1.3% lower than the determined unit cost (65.82 €2017). The terminal 2020/2021 actual unit cost was 240.11 €2017, in line with the determined unit cost (240.39 €2017).

▪ The en route 2021 actual service units (1,988K) were +3.3% higher than determined (1,925K).

▪ In 2021, Portugal increased total costs by +1.1 M€2017 (+0.9%) compared to determined costs. The increase was driven by an increase of +7.0% in staff costs (+5.4 M€2017) due to an increase in pension fund costs, contingent liabilities, and non-materialised capitalised work.

▪ All the other cost categories decreased compared to determined. Cost of capital decreased by -34% (-1.1 M€2017) due to a postponement in the implementation of the new ATM System.

▪ NAV Portugal spent 13 M€2017 in 2021 related to costs of investments, -3.0% less than determined (14 M€2017), due to a postponement in the implementation of the new ATM System (TOPLIS – TOPSKY) as requested by the Network Manager in order to avoid simultaneous transitions of ATM systems with the Reims and Marseille ACCs (also planned for the beginning of 2022).

▪ The en route actual unit cost incurred by users in 2020/2021 was 66.27€, while the terminal actual unit cost incurred by users was 246.22€.

En route charging zone

Unit cost (KPI#1)

Actual and determined data
Total costs - nominal (M€) 2020-2021 2022 2023 2024
Actual costs 234 NA NA NA
Determined costs 233 139 150 155
Difference costs 1 NA NA NA
Inflation assumptions 2020-2021 2022 2023 2024
Determined inflation rate NA 1.2% 1.3% 1.4%
Determined inflation index NA 103.6 104.9 106.4
Actual inflation rate NA NA NA NA
Actual inflation index NA NA NA NA
Difference inflation index (p.p.) NA NA NA NA
Focus on unit cost

AUC vs. DUC

In the combined year 2020-2021, the en route AUC was -1.3% (or -0.87€2017) lower than the planned DUC. This results from the combination of higher than planned TSUs (+1.8%) and higher than planned en-route costs in real terms but in a lesser proportion (+0.5%, or +1.1 M€2017).

En route service units

The difference between actual and planned TSUs (+1.8%) falls within the ±2% dead band. Hence the resulting additional en-route revenue is kept by the ANSPs.

En route costs by entity

Actual real en route costs are +-0.5% (+1.1 M€2017) higher than planned. This is driven by the main ANSP, NAV Portugal (+0.9%, or +1.7 M€2017), while the costs of the SAR provider and the MET provider are in line with the plan (+0.1% and -0.03%, respectively) and the NSA/EUROCONTROL costs are lower than planned (-3.4%, or -0.6 M€2017).

En route costs for the main ANSP at charging zone level

The higher than planned en route costs in real terms for NAV Portugal (+0.9%, or +1.7 M€2017) result from:
- higher staff costs (+3.6% for the period 2020-2021), “mainly due to the following factors: i) Higher pension fund costs, namely in NAV/CTA-MT; ii) Contingent liabilities arising from specific situations in which ATCOs do not meet the requirements for access to retirement status;iii) Capitalized work that did not materialize at the same level as planned;”
- lower other operating costs (-12.3%), mainly explained by lower spending on IT assistance and other outsourced services, repair and maintenance, communication and travel;”
- slightly higher depreciation (+0.8%); and
- lower cost of capital (-21.5%), due to a slight delay in implementation of the new ATM System.

Actual unit cost incurred by the users (AUCU) (PI#1)

AUCU components (€/SU) – 2020-2021
Components of the AUCU in 2020-2021 €/SU
DUC 66.88
Inflation adjustment 0.00
Cost exempt from cost-sharing -0.50
Traffic risk sharing adjustment 0.00
Traffic adj. (costs not TRS) -0.16
Finantial incentives 0.00
Modulation of charges 0.00
Cross-financing 0.00
Other revenues 0.00
Application of lower unit rate 0.00
Total adjustments -0.65
AUCU 66.22
AUCU vs. DUC -1.0%
Cost exempt from cost sharing by item - 2020-2021 €'000 €/SU
New and existing investments -1,149.7 -0.32
Competent authorities and qualified entities costs -38.0 -0.01
Eurocontrol costs -580.9 -0.16
Pension costs 0.0 0.00
Interest on loans 0.0 0.00
Changes in law 0.0 0.00
Total cost exempt from cost risk sharing -1,768.5 -0.50
Focus on AUCU

The actual en route unit cost incurred by airspace users (AUCU) in respect of activities performed in combined year 2020-2021 (66.27€) is -0.9% lower than the nominal DUC (66.88€) which includes DUC initially charged: 40.19€; and to be charged: 26.69€. The difference between these two figures (-0.61€/SU) is due to:
- the impact of adjustments resulting from the costs exempt from cost-sharing mechanism (-0.45€/SU); and
- the deduction of the traffic adjustment (-0.16€/SU) for the costs not subject to traffic risk sharing to be reimbursed in future years.
It should be noted that Portugal decided not to charge the inflation adjustment for 2020-2021 to airspace users.

The share of regulatory result in the AUCU (before the deduction of other revenues) is 2.1%.

Regulatory result (RR)

Focus on regulatory result

NAV Portugal net gain on activity in Portugal Continental en route charging zone in the combined year 2020-2021
NAV Portugal generated a net gain of +0.7 M€, resulting from a loss of -2.8 M€ arising from the cost sharing mechanism and a gain of +3.5 M€ arising from the traffic risk sharing mechanism.
NAV Portugal overall regulatory results (RR) for the en route activity
Ex-post, the overall RR corresponding to the net gain from the en route activity mentioned above (+0.7 M€) and the RoE (+3.7 M€) amounts to +4.4 M€ (2.2% of the en route revenues). The resulting ex-post rate of return on equity is 7.2%, which is higher than the 6.0% planned in the PP.

 