Cost-efficiency - MUAC
PRB monitoring
▪ MUAC 2020-2021 actual costs amounted to 358 M€2017, -0.6% lower than the determined costs for the combined year 2020-2021 (360 M€2017).
▪ Actual 2020-2021 MUAC costs were allocated across the four Member States in the following way: Belgium 33%, Luxembourg 1%, Germany 45%, the Netherlands 21%.
Total costs
| Actual and determined data | ||||
| Total costs - nominal (M€) | 2020-2021 | 2022 | 2023 | 2024 |
|---|---|---|---|---|
| Actual costs | 378 | NA | NA | NA |
| Determined costs | 378 | 236 | 240 | 240 |
| Difference costs | 0 | NA | NA | NA |