Annual Monitoring Report 2025 - Lithuania
Contextual information
National performance plan adopted following Commission Decision (EU) 2025/1056 of 19 May 2025
List of ACCs 1
Vilnius ACC
No of airports in the scope of the performance plan
≥80’K 0
<80’K 0
Exchange rate (1 EUR=)
2022: 1 EUR
2025: 1 EUR
Share of Union-wide traffic (TSUs) 2025 0.4%
Share of Union-wide en route costs 2025 0.4%
Share en route / terminal costs 2025 100% / 0%
En route charging zone(s)
Lithuania
Terminal charging zone(s)
Main ANSP
• Oro Navigacija
Other ANSPs
• LGS (Latvian ANSP)
MET Providers
• Lietuvos hidrometeorologijos tarnyba (Lithuanian Hydrometeorological Service, LHMS)
Traffic (En route traffic zone)
Lithuania recorded 222K actual IFR movements in 2025, +5.1% compared to 2024 (211K).
Actual 2025 IFR movements were -0.5% below the plan (223K).
Actual 2025 IFR movements were -26.9% below the actual 2019 level (303K).
Lithuania recorded 496K actual service units in 2025, +8.5% compared to 2024 (457K).
Actual 2025 service units were +3.1% above the plan (481K).
Actual 2025 service units are -19.9% below the actual 2019 level (619K).
Safety (Main ANSP)
In 2025, Oro Navigacija achieved the planned maturity levels set out in its performance plan for all five components of the EoSM.
Lithuania has not included any airports in their RP4 performance plans, thus not reporting on runway incursions during the reference period.
The rate of separation minima infringements (SMIs) at State level was 3.61 and equal to the rate of SMIs at ANSP level. Both indicators were below the Union-wide average. Comparing to 2024, rate of SMIs has decreased slightly at State level and at ANSP level.
Environment (Member State)
Lithuania registered a KEA performance of 11.41 % compared to its target of 13.13% and contributed positively towards achieving the Union-wide target.
KEP and KES both improved in comparison with 2024. The improvement in KES shows that Lithuania has improved the element of horizontal flight efficiency that is under its control.
VFE of the actual trajectory was at 70.07%, which was worse than the Union-wide average.
No airports are included in the performance plan for monitoring.
Capacity (Member State)
Lithuania registered 0 minutes of average en route ATFM delay per flight during 2025, which remained 0 after the post-ops adjustment process, thus achieving the local target value of 0.03. Delays in Lithuania remained stable year-on-year.
The number of ATCOs in OPS was 34, being above the 2025 plan in Vilnius ACC by 2 FTE.
The yearly total of sector opening hours in Vilnius ACC was 43,681, showing a -1% decrease compared to 2024.
Vilnius ACC registered 5.07 IFR movements per one sector opening hour in 2025, being 19% above 2024 levels.
Cost-efficiency (En route/Terminal charging zone(s))
The en route 2025 actual unit cost of Lithuania was 53.21€2022, -4.2% lower than the determined unit cost (55.57€2022). Lithuania does not have a terminal charging zone.
The en route 2025 actual service units (0.50M) were +3.1% higher than the determined service units (0.48M).
The en route 2025 actual total costs were -0.3M€2022 (-1.3%) lower than determined. This is mainly due to lower other operating costs (-0.3M€2022, or -7.6%) and cost of capital (-0.3M€2022, or -14.0%) for Oro Navigacija, partially compensated by unplanned exceptional items (+0.5M€2022). The NSA explained that the decrease in other operating costs is attributable among others to lower utilities, office-maintenance and consultancy costs, while for cost of capital, it is due to a lower return on equity. The unplanned exceptional items reflect the one-off adjustment related to the ATCO’s early-retirement scheme.
Oro Navigacija costs of investments were 4.1M€2022 in 2025, -11.5% less than determined (4.7M€2022). According to the NSA, this reduction was mainly due delays in smaller investments, caused by longer procurement procedures, unsuccessful tenders due to a lack of bids, and technical or supplier-related issues.
The en route actual unit cost incurred by users in 2025 was 59.22€ (-2.1% below the 2025 DUC). The difference between the AUCU and the DUC is mainly driven by new and existing investments in cost exempt from cost sharing.
The en route regulatory result for Oro Navigacija amounted to +2.6M€, or 10.1% of the 2025 revenue. This may indicate that the airspace users are charged for costs which have not materialised in 2025.