Safety - Belgium
PRB monitoring
In 2025, Skeyes did not achieve the planned maturity levels set out in its performance plan for any of the five components of the EoSM. Moreover, Skeyes scored A for all SM objectives and needs significant improvement in order to reach the targets by the end of RP4.
The rate of runway incursions (RI) was 0.98 and equal to the RIs with ANS contribution, with the former indicator below the Union-wide average while the latter above. The rate of RIs has increased compared to 2024.
The rate of separation minima infringements (SMIs) at State level was 5.04, and at ANSP level 9.31. The rate of SMIs was below Union-wide average at State level and above Union-wide average at ANSP level. When comparing to 2024, rate of SMIs has decreased at both State level and ANSP level.
Effectiveness of Safety Management (EoSM) (KPI#1)
Safety occurrences
Rate of runway incursions (RIs) (PI#1) and Rate of runway incursion with ANS contribution (PI#3)
| Rate of RIs per 100,000 airport movements - Belgium | ||||||
| # | Airport name | APT movements | Number of RI | Rate RI per 100,000 | Number of RI with ANS contribution | Rate RI per 100,000 with ANS contribution |
|---|---|---|---|---|---|---|
| 1 | Brussels | 204,151 | 2 | 0.98 | 2 | 0.98 |
Rate of separation minima infringements (SMIs) (PI#2) and Rate of separation minima infringements with ANS contribution (PI#4)
| Rate of SMI with ANS contribution per 100,000 flight hours | |||||||||||||||||||||
| # | ANSP |
Flight hours
|
Number of SMIs with ANS contribution
|
Rate of SMI with ANS contribution per 100,000 flight hours
|
% variation in rate of SMIs
|
||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 2026 | 2027 | 2028 | 2029 | 2025 | 2026 | 2027 | 2028 | 2029 | 2025 | 2026 | 2027 | 2028 | 2029 | 2025 | 2026 | 2027 | 2028 | 2029 | ||
| 1 | skeyes | 204,151 | NA | NA | NA | NA | 19 | NA | NA | NA | NA | 9.3 | NA | NA | NA | NA | NA | NA | NA | NA | NA |