• Home
  • SES view
  • State view
    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • FABEC
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • NM View
  • Investments
    • SES RP4

    • Austria
    • Belgium
    • Bulgaria
    • Croatia
    • Cyprus
    • Czech Republic
    • Denmark
    • Estonia
    • Finland
    • France
    • Germany
    • Greece
    • Hungary
    • Ireland
    • Italy
    • Latvia
    • Lithuania
    • Luxembourg
    • Malta
    • MUAC
    • Netherlands
    • Norway
    • Poland
    • Portugal
    • Romania
    • Slovakia
    • Slovenia
    • Spain
    • Sweden
    • Switzerland
  • About
  • Download
  • Data Portal
  • Publications
  1. Capacity
  • Year report
    • 2025 ✓

    • RP3
      • 2024
      • 2023
      • 2022
      • 2021
      • 2020

  • Cyprus
  • Overview
    • Contextual information
    • Traffic
    • Safety
    • Environment
    • Capacity
    • Cost-efficiency

  • Safety
    • PRB monitoring
    • EoSM
    • Safety occurrences
      • Separation minima infringements

  • Environment
    • PRB monitoring
    • En route performance
      • Flight efficiency
    • CIV-MIL

  • Capacity
    • PRB monitoring
    • En route performance
      • En route ATFM delay
      • En route performance indicators at ACC level
      • Other information

  • Cost-efficiency
    • PRB monitoring
    • En route CZ
      • Unit cost
      • AUCU
      • Regulatory Result

Capacity - Cyprus

Download Report

PRB monitoring

  • Cyprus registered 0.03 minutes of average en route ATFM delay per flight during 2025, which remained 0.03 after the post-ops adjustment process, thus achieving the local target value of 0.17. Delays in Cyprus increased by 0.02 minutes per flight year-on-year.

  • The number of ATCOs in OPS was 105, being below the 2025 plan in Nicosia ACC by -2 FTE.

  • The yearly total of sector opening hours in Nicosia ACC was 29,851, showing a 8% increase compared to 2024.

  • Nicosia ACC registered 14.57 IFR movements per one sector opening hour in 2025, 6% above the 2024 level.

En route performance

En route ATFM delay (KPI#1)

NoteFocus on en route ATFM delay

En route ATFM delay

  • Cyprus had 435k flights in 2025, up from 379k flights in 2024.

  • DCAC Cyprus applied en route ATFM regulations resulting in 12k minutes of delay, an increase from the 2k minutes in 2024.

Regarding the reasons and circumstances resulting in the achieved level of actual performance of the en route ATFM delay per flight KPI, the NSA reports: “The ANSP has duly implemented its capacity plan.”

En route capacity incentive scheme

The Cypriot NSA reports a financial bonus for the ANSP of €443,412 for en route capacity performance in 2025. A local incentive target was set at 0.17 min/flight, for all causes of delay, and an actual value of 0.03 mins/flight was achieved.

En route performance indicators at ACC level (PI#4-5)

NoteFocus en route performance indicators at ACC level

Percentage of total en route ATFM delay that occurred on days when the daily throughput was above the expected daily traffic

No comment provided.

Annual weighted average of the daily peak throughput

No comment provided.

Other en route information

NoteFocus on other en route information

ATCOs in operations

As additional comments to ATCOs in the scope of the performance scheme, the NSA reports: “By the end of 2025, the total number of operational Air Traffic Control Officers (ATCOs in OPS) employed by DCAC Cyprus stood at 142 (141.5 FTEs), compared to the 138 FTEs projected in the Performance Plan (PP). This deviation does not stem from an accelerated recruitment policy or unplanned hiring campaigns. It is the result of a data rectification and subsequent operational reassignments identified during the 2025 monitoring cycle:

• Statistical Omission (+6 ATCOs): the 2025 monitoring review revealed that six ATCOs executing mixed duties across two distinct operational units—the Area Control Centre (ACC) and the newly established Approach Unit—were erroneously omitted from the initial PP baseline headcount.

• Operational Reassignments (-2 ATCOs): This statistical increase was partially offset by the reassignment of two ATCOs to non-operational duties due to medical and other reasons. These two cases are additional to the reassignments already anticipated in the CY RP4 Performance Plan.

The net operational impact of these two factors results in a factual increase of +3.5 FTEs compared to the Performance Plan. This correction ensures full transparency and accuracy in reporting the actual operational capacity.”

“Nicosia (LCCC ACC):The year-end ACC ATCOs (FTEs) of the Cyprus ATSp, at the end of 2025, stands at 101.5, falling short of the planned target of 107 — a variance of 5 FTEs. This shortfall is attributable to one ATCO retirement AND (mainly) a tactical operational decision regarding the extension of operating hours of the Approach Unit:

During the PR4 planning phase, it was anticipated that 5 Tower/Approach ATCOs would be transferred to the ACC by mid-2025. However, following a tactical reassessment, it was determined that retaining these personnel within the Approach Unit would yield greater operational benefit by facilitating an extension of that Unit's hours of operation. The expanded operating schedule of the new Approach Unit strengthens the ANSP's overall safety performance and indirectly enhances ACC capacity by absorbing a portion of the en-route sector workload, thereby offsetting the impact of the ACC staffing levels.

This proved to be a correct operational decision because, in the end, the capacity targets were met.”

Regarding the training process, including details on the effective failure rate and the process used to allocate newly qualified ATCOs between ACC, APP and TWR positions, the NSA reports: “Selection and recruitement process for new ATCOs has commenced in 2025, however it will be completed within 2026 (due to long, bureaucratic administrative processes). New ATCO training is expected to begin before the end of 2026. This will shift ATCO planning forward by one year.”

 